BREEAM Energy efficient cold storage
Contents |
[edit] Aim and benefits
To reduce the energy demand and as a result the associated operational greenhouse gas emissions.
This issue offers the following potential benefits to end users and clients:
- Reduced energy consumption / energy bills.
[edit] When to consider
At your pre-assessment, consider whether this credit is applicable or not. If you're not sure, the chances are more than likely it is NOT applicable.
This credit does not apply to:
- Domestic scale white goods
- Catering scale white goods
- Refrigerated display cabinets in cafes
- Usually walk in fridge and freezers in schools/cafes
The credit ONLY applies to refrigeration units cooled by the building's chillers, rather than their own stand alone refrigeration units. You may find this in:
- Warehouses
- Supermarkets
- Factories
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
- Is the refrigeration powered by the building's chillers? Or are they stand alone refrigeration units?
[edit] Tools and resources
Awaiting content
[edit] Tips and best practice
Awaiting content
[edit] Typical evidence
[edit] Design Stage
- Formal written confirmation from the refrigeration system designer (who may in turn get the information from a manufacturer) that it has been designed in accordance with the Code of Conduct for Carbon Reduction in the refrigeration retail sector and BS EN 378-2.
- Formal written confirmation from the refrigeration system designer (who may in turn get the information from a manufacturer) that robust and tested refrigeration systems/components have been used.
- A copy of the ERs, or written commitment from the contractor, or M&E sub contractor that the refrigeration system will be installed and commissioning in accordance with Code of Conduct for Carbon Reduction in the refrigeration retail sector and BS EN 378-2.
- Retail:
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Tom Blois-Brooke 16:37, 01 Jul 2019 (BST)
Featured articles and news
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.